Wolf Pack
Mar 28, 2016

Bush Camp
Mar 22, 2016

Staying Current
Mar 15, 2016

Staying Current September 2014
Oct 15, 2014

Post Graduate Flying 2014-07-18
Jul 21, 2014

Hydraulic Fracture
2011-08-30
Rotorworks took a customer out to look at a Hydraulic Fracture (Frac) being completed on a well near Edson. The company doing the "frac" was Schlumberger and the work consisted of high pressure pumps mounted on trucks pumping fluid down the well into the producing formation to push the rock formation apart. When the rock has been "fractured", then a sand slurry is injected to hold the fracture open after the pumping has stopped. This enables the oil or gas to flow through the sand more readily than the rock formation.

Wellsite where the Hydraulic Fracture was being completed. Trucks set up to suck the fluid out of the round reservoir and the vertical tanks
Red Fire Truck in the foreground for any  potential problems. Sand Trailers - right side, High Pressure Pumpers - middle, Nitrogen Pumpers - left side, wellhead in the middle with steel piping tied into it.
   
  
Photos courtesy of Michael Young, Mayday Resources Ltd.